Daily plant checklist

Start-up, hourly readings, production, stoppages and end of shift. For pellet, fertilizer or feed lines.

What you enter is saved only on this device until you start over. When you finish, download the PDF.

Shift details

Start-up check

Control panel without alarms, emergency stops tested
Guards and covers in place
Gearbox oil level
Bearings and rollers greased as planned
Die clean and unobstructed
Hoppers and silos with enough raw material
Screw conveyors, elevators and belts clear
Compressed air and steam at pressure (if used)
Cooler and screen clear
Bagging machine calibrated and stocked

Hourly readings

No.TimeMain machine amperage (A)Product temp. (°C)Raw mat. moisture (%)Produced (kg)Note
1
2
3
4
5
6
7
8

Shift production

Stoppages

No.FromToCauseAction taken
1
2
3
4

End of shift

Notes for the next shift

Signatures

Signatures go by hand on the printed PDF.

What it is for

A plant that is checked every day produces more and breaks down less. This form organizes what the operator checks at start-up, what is logged every hour (amperage, temperature, moisture and kilos) and how the line is left at the end of the shift. Stoppages are recorded with their cause, which is what later lets you fix the root problem.

How to use it

The operator fills it in on a phone or tablet during the shift: entries stay saved on the device. At the end, they download the PDF and file it or send it to the supervisor. If you prefer paper, download the blank version and print it.